Construction of 7th Maintenance Provost Caterpillar Vehicle Workshop and Construction for the Adjustment of the Workshops.
Caterpillar Vehicle Building is composed of 2 floors as Ground Floor and 1st Floor. Sitting area of Ground Floor is 2.709m2 and Sitting area of 1st Floor is 438 m2. Totally 3.147m2. Water tank of 500 Tons, field concrete is 26.400 m2. Landscaping infrastructure, sewage system as well as mechanical and electrical works thereof.
Project Details
- Employer MSB İNŞ EML VE NATO GÜVENLİK YATIRIMLARI DAİRE BAŞKANLIĞI
- İşin Adı Construction of 7th Maintenance Provost Caterpillar Vehicle Workshop and Construction for the Adjustment of the Workshops.
- Contract Year 2010
- Building Area 3147m2
Other Projects
MHF. A.K.LIĞI GENEL ONARIMLARI
011
KONUT İNŞAATI
022
EMNİYET MÜDÜRLÜĞÜ
033
MSB ANT BAŞKANLIĞI
044
DEVLET HASTANESİ
055
Proje Resimleri




